Office: 01473 677293 [email protected] Mon–Fri 7:00–17:00 · Sat 9:00–14:00
We’re hiring — join our team →
Lipame Group
Home / Services / SWA cabling
Specialism · SWA submains

SWA power cables — pulled, connected, tested

This is what we do best. We pull big armoured power cables, fit the glands, connect them and test them — in hospitals, schools and plant rooms.

Up to large-section multicoreLV switchroomsExternal ducts
Send drawings for pricing See projects
Lipame electrician laying SWA cables into rooftop tray
SWA into rooftop tray · Sheffield
What we do

From drum to busbar

We take SWA submains from delivery to energisation — handling, pulling, glanding, terminating and testing — so your switchroom is ready on programme.

Cable drum handling & pullingDrum jacks, rollers, winches and pulling crews for long, heavy runs through ducts, tray and ladder.
Glanding & terminationsCW/BW glands, earth tags and shrouds; lugs crimped and torqued onto busbars, MCCBs and switchgear.
LV switchrooms & distributionSubmains to main switchboards, sub-distribution boards, plant and landlord supplies.
External & underground routesCables through ducts and draw pits between buildings, substations and plant.
Testing & certificationInsulation resistance, continuity and polarity tests, recorded and certified under NICEIC.
Labelling & recordsCable ID, as-fitted mark-ups and results packaged for O&M.
Gallery

Recent SWA work

SWA cores terminated onto busbars
Sheffield hospital · busbar connections
Three-phase SWA terminations with earth tails
Sheffield hospital · tightened to spec
Main earth bar with labelled earth cables
Main earth bar
SWA cable drum on site with scissor lift
Drum handling · Sheffield
Crew pulling SWA through external ducts
External duct pull · Thurrock
Engineer terminating SWA on busbar chamber
Sheffield hospital · connecting cables
SWA cables on rooftop cable tray at Sheffield hospital
Sheffield hospital · rooftop tray
Long run of SWA cables on ladder tray along a corridor
Long SWA run on ladder tray
Cables pulled along a roof tray
Roof tray · cable pull
Long cable tray run across a flat roof
Flat roof · tray run
Large SWA cables pulled in to a new LV switchboard
Pulled in to the LV switchboard
SWA cables laid out across the plant room floor during the pull
Cable pull in progress
SWA cables on ladder rack above the plant room
SWA on ladder rack
Large SWA cores terminated on copper busbars in a new panel
Terminated on busbars
How we work

A pull you can plan around

01

Survey & quantities

Routes walked, drum lengths and pulling tensions checked against drawings.

02

Pull plan

Crew size, rollers, winch points and drum positions agreed with your site team.

03

Install & terminate

Cables pulled, cleated, glanded and terminated to manufacturer torque settings.

04

Test & hand over

IR and continuity results, labels and as-fitted drawings issued.

Watch · Thurrock, 2025

Pulling big cables with an electric winch

Rollers in the trench, a steady electric winch and a team on the line. The cable comes through the ducts at an even pull — no kinks, no damage, no rush.

  • ✓ Electric winch with controlled pull
  • ✓ Cable rollers set in the trench and at bends
  • ✓ Team in radio contact along the route
Accreditations

Accredited & approved

Every certificate can be checked on the NICEIC, MCS, TrustMark and Constructionline registers.

NICEIC Approved Contractor · 613934000
MCS Certified Solar PV & battery · NIC601130
TrustMark – Government Endorsed Quality Registered business
Constructionline Gold Member Gold · 1209037
PQS Health & Safety Approved, SSIP registered SSIP · valid to 05/2027
Contact

Pricing a job? Send us the drawings.

For main contractors, M&E contractors and developers. Send the tender pack and we send back an itemised quote — quantities, clarifications and exclusions, clearly set out.

Office: 01473 677293 [email protected] Unit 19, Dales Road Business Centre, Dales Road, Ipswich, Suffolk IP1 4JRGet directions → Mon–Fri 7:00–17:00 · Sat 9:00–14:00
Packages to price