Case study · School solar PV

Plume Academy, Maldon: solar on two school roofs.

Two roofs, two different builds: a ballasted array on a flat roof with inverters on the roof, and flush arrays on a metal roof wired down to inverter walls inside — set out, fixed, tested and handed over by our own team.

SitePlume Academy, Maldon
TypeSchool · commercial PV
Roof 1Flat roof · April 2026 · 32.4 kWp
Roof 2Metal roof · July 2026 · 30.9 kWp
Panels123 × 515 W all-black · 63.3 kWp
Completed flat roof array with the inverter stand and canopy on the Plume Academy roof
The challenge

A working school with two very different roofs — one flat membrane roof that could not be drilled, one profiled metal roof — and work to be done safely around the school day.

Our approach

A different build for each roof: ballasted frames and a roof-top inverter stand on the flat roof; rails clamped to the seams and inverters inside on the metal roof.

The result

Roof 1 handed over in April, roof 2 in July 2026 — neat arrays, labelled isolators and meters, and every string tested.

Rows of black solar panels on a flat school roof on a sunny day
Roof 1 · April 2026

Flat roof — ballasted frames, inverters on the roof

Set out on the membrane roof, ballasted frames laid without drilling a single hole, panels fitted row by row — and the inverters on a strut stand under a canopy, right on the roof. Every string tested before handover.

Lipame engineers setting out frames on the flat roof
1 · Setting out
Frames laid out across the flat roof
2 · Frames down
Strut stand for the inverters going up on the roof
3 · Inverter stand
First rows of panels on the frames
4 · Panels on
Inverter, isolators and canopy on the roof stand
5 · Inverter under a canopy
Seaward PV tester showing string results
6 · Every string tested
Large rectangular solar array on the metal school roof
Roof 2 · July 2026

Metal roof — flush arrays, inverters inside

On the second building the roof is profiled metal: rails clamped to the seams, cables run along the rails, a wide block and a long run beside the walkway — then wired down to inverter walls inside.

Rails and cable routes set out on the metal roof
Rails set out
DC cable ready to run along the rails
Cables along the rails
First panels going on
First panels on
Finished array from another angle
Finished block
Long array beside the walkway
Long run by the walkway
Array at the end of the walkway
Along the walkway
Inside

Inverters, isolators and meters

Inverters fitted on unistrut frames with DC isolators, generation meter and AC isolator — level, labelled and easy to service.

Setting out the inverter wall with a laser level
Set out with a laser
Inverter with DC isolators and meter on strut frame
Inverter wall
Second inverter wall with isolators
Second inverter
Generation meter and AC connections
Meter & AC side
Watch

See how we work

Solar PV and battery installations across the UK — from roof to inverter to switch-on, by our own team.

Watch on YouTube →
Lipame installer on a roof — still from our solar video Brightening Britain — Lipame Solar PV & battery installations
Contact

Solar for your school or business?

Send us your roof plan or electricity usage and we’ll size the system.

Office: 01473 677293 [email protected] Unit 19, Dales Road Business Centre, Dales Road, Ipswich, Suffolk IP1 4JRGet directions → Mon–Fri 7:00–17:00 · Sat 9:00–14:00
What would you like?